Hi,
i deploy the "Core Workmanger 6.0" (which is provided by SAP) in SMP 2.3. and it is working fine. in SCC --> Application status is showing as RUNNING.
if we done any changes in the WokrManager & deploy it. and it is showing attached Error Messages(JavaBackEndError, EADDRINUSE etc..). Please check the Attached Images..
Can any one provide the guidelines/steps for How to Deploy the Edited/Modified Work manger in SMP 2.3.
Thanks
Krishna
Tags edited by: Michael Appleby