Hi Gurus,
As per the standard SAP, we can release a Project/WBS without releasing the budget, but our requirement is only budgeted projects should be released. We want the System status (not user status) BUDG active before REL can be set.
How do we control the same? Your inputs will be appreciated and well rewarded with points.
Thanks
Jagdish